Wednesday, December 10, 2008

Looking for the Greener/Dirtier Compromise

Getting to 20% by 2020 ain't no easy thing. The commitment by the EU to reduce its greenhouse gases by 20% is nearing some negotiation deadline which is this weekend (Dec. 13th). Poland and Germany are looking for solutions to uphold their right to continue on the coal fired power plant route. Their continued heavy reliance on coal and the lack of effective technologies to deal with the gases means they are set to be screwed when it comes to paying for Carbon Permits.

So what are the solutions. Well, they wouldn't mind a free allocation of permits for the coal industry too (along with the ones they've sought for their other industries). Poland is pressing for a money bank, which transfers more money from Rich to East (FT). Well, I think that is what the EU is already doing.

But let's think about this for a second. You have coal reliant countries with heavy industry trying to keep their power prices low to retain industry. Then you have the other countries who are more diversified in their energy mix and industry. But the thought that comes to my mind is many of these 'other' countries shifted their energy sources, not because it was the greener thing to do, but because of either a state strategy or the endowment of other energy sources. So while I do not want to defend the continued use of dirty coal - or more specifically, the ability to externalize, as compared to internalize, the cost of greenhouse gas pollution, there does need to be a clearly defined transition for these states.

The idea here is that these states have known about the schemes that will be implemented to control GHG emissions for many years, but have failed to act effectively -notably Poland.

What needs to be devised is a strict timetable connected to the allocation of 'free' permits, which are reduced over time. I don't know whether it should be fast or slow, but not beyond 5 to 10 years, the amount of time it would take to build new power plants and the ability to store carbon (ok, this is very optomistic on this last point). If you can get the German economic and scientific machine behind this, then the timetable is appropriate.

There is no doubt that this is a very tight timetable, but the idea is that there is a period of transition which gets the countries to agree now and moves their industry and economy towards a sustainable energy system. Punishment or a lack of agreement will only make future progress that much more difficult.

Tuesday, December 2, 2008

Evidence for More Investment Spending

Well, predictions are not always right. Just yesterday I wrote questioning the FT article about the drop off in investments by energy companies - particularly generation. When what do my eyes upon opening the Wall Street Journal yesterday but RWE spending $1.25 billion this year (so far) on greenhouse-gas compliance. Up from Euro 175 million.

The article in the WSJ, (subscription only), outlines the need by generators, particularly RWE, E.On and Enel's need to spend money on reducing GHG because they need to buy additional permits above their free quota. After 2012 - these freebies will no longer exist. Thus RWE, which is heavily reliant on brown coal, is screwed if it doesn't invest in clean coal technologies. At around 29 euros per permit with a projected need of 200 million permits by 2012.

Thus, investments are happening. "We have to renew our power plants as fast as possible," RWE states in the article. The choice is modernize or replace power plants to reduce the GHG emissions.

Now the idea becomes one of job creation. No doubt the economic downturn in all countries and regions, including CEE has seen a huge drop in the number of construction jobs. So if we think about the looming deadline of the free Co2 allowances being taken away by 2012, there's a lot of construction that needs to occur. But rather than foster this job creation, we see the CEE countries complaining that they can't meet this target. They're lobbying Brussels to allow free quotas after 2012. As my father would say, 'get to work!'

And getting to work is right, because we just don't need to build new coal power plants that pump Co2 into the ground, but a range of energy sources need to be utilized. One company that keeps adding jobs in Hungary (and now Spain) is Genesis, which makes solar panels. In fact now, as the article states, RWE is giving away 700,000 energy efficient light bulbs in India in a carbon swap.

I believe Obama sees the economic downturn as a time to re-engineer the manufacturing base and construction base of America, I also believe this can be done for the CEE region. Poland, is 96% reliant on coal and the other countries also contain significant coal generation, but get to work - jobs need to be created.

Monday, November 24, 2008

Importing electricity free of CO2 standards

"Cheap electricity, want some cheap and dirty electricity." That's the possibility.

Over the past few days the same topic came up with a few people, importing electricity from outside the EU without a 'carbon tax.' The possibility exists that once Europe gets going on the European Emissions Trading System (ETS), that electricity produced further east could serve not only as a place to locate manufacturing (mentioned further below), but as a location to import cheap electricity from.

Importing electricity from Russia, the Ukraine, Belarus and from whoever else can manage to connect their power plants to the UCTE network, will offer the ability to undercut electricity producers in the EU. And more importantly, it will also undercut the very goal of reducing CO2 and other emissions to prevent the globe from really heating up (as compared to only slightly). Of course importing electricity into the union is dependent on the size of the interconnectors besides the use of existing ones, will we be seeing a huge building of newer interconnectors with the peripherial countries of the EU? Possibly, and here is why.

Poland is 96% dependent on coal and has not acted quickly enough to diversify. Now manufacturers and producers are freaking out about the looming implimentation of CO2 emmission quotas. There is a fear that manufacterers could easily pick up and move next door to the Eastern countries. However, wouldn't it be easier to build interconnectors to an external EU neighbor, which every country has the right to do, then ship this electricity into the country for manufacterers? While I would expect there are no big plans currently for this, particularly with Russia (excluding a merchant line from Russia to Sweden), the situation may arise if the price differential is great enough. Market forces of supply and demand may take over and make such projects feasible, even over current diplomatic relations.

Russia already has plans to not only build a nuclear power station in Kalingrad but to boosts its electricity producing capacity domestically to ship to the EU (as it already does to China). So the question that arises is 1) will the EU impliment a carbon tax on imports quickly, 2) accept imports for the short-term but not the long-term, 3) or do nothing in order not to sneak in some cheap electricity to help out those emerging economies that need a little support?

The last option is lame, and undermines the basis of EU actions, the second option may be the muddled policy response the EU puts together, however, just as there's been a history of EU opinion on the phasing out of long-term power purchase agreements, there also need to be excplicit statements that any infrastructure that is built is at risk for having a carbon tax imposed on imports. Thereby making it clear that power plants and transmission lines built must also be commericaly viable under a CO2 quota system. The first response could still happen quickly enough, but I think ambiguity will reign for a while.

Which ever way carbon taxing goes, it is clear that specific regional associations need to be linked by larger groupings which play by similar rules. But that is a topic for another day.